PROCEDURES MANUAL(PM)

Aproject Procedures Manual (PM) is produced for every Lavante Garde project.

The Procedures Manual will contain the detailed instruction that describe, either directly or by reference to Standards, how the project will be executed within the terms of the Contract. The Project Architect will be responsible for the preparation, distribution and updating of the Procedures Manual. This will include, if necessary, gaining the Client's approval that the finished product provides a satisfactory representation of the requirements for the execution of the project.

The under listed is the general procedure manual for projects generally ,adapted to specific projects.

 

THE PROCEDURES MANUAL:

 

1. Project Scope

  • Scope definition of services and facilities.
  • Functions and responsibilities.
  • Standard policies and procedures

 

2. Project Management 

  • Policies and Procedures
  • Functions and responsibilities
  • Organisation/Communications
  • Change control

 

3. Process and Design Process:

  • Functions and responsibilities
  • Policies and Procedures
  • Functions and responsibilities
  • Clients' responsibilities
  • Lavante Garde responsibilities
  • Distribution and Communications
  • Drawings
  • Drawings status reporting
  • Calculations
  • Specifications including Bills of Quantities
  • Monthly status reporting
  • Deviations
  • Change orders
  • Equipment design schedule
  • Supplier data and control
  • Cost estimate
  • Project schedule
  • Design co-ordination
  • Project filing.                                                            
  • Computer Aided Design and Drafting
  • Technical reviews
  • Safety
  • Environmental issues            

 

4. The above are detailed Lavante Garde procedures,which govern the way in which we do our work. They apply entirely or in a very large part to almost

every project undertaken. They form the basis of the Procedures Manual and will be referenced therein where they are applicable and where parts need

to be amended to suit the project and circumstances.

 

5. Project Execution Plan (PEP)

AProject Execution Plan is completed for each project. This is more broadly based document than the Procedures Manual and sets out the overall strategy for the management and execution of the project.

Typical content of a Project Execution Plan would be the plans for:

  • Quality
  • Safety
  • Manpower and staffing
  • Process and design engineering
  • Construction
  • Continuous improvement
  • Turnover,commissioning,acceptance